Development of a CANDU Full Scope Simulator for the Embalse Nuclear Power Station

Main Article Content

Raymond Dimitri-Hakim
Michael Chatlani

Abstract

L-3 MAPPS has developed CANDU 6 full scope operator training simulators for nearly four (4) decades (since 1973). The last full scope CANDU simulator that was developed was for Qinshan Phase II plant in Zhejiang, China and the simulator was put into service in the first quarter of 2003. Up to this point, L-3 MAPPS simulators for CANDU plants had largely capitalized on legacy technologies developed in the 1970’s and 1980’s. In the meantime, significant technology advances were made on simulator programs for Light Water Reactors and gas-cooled reactors and through upgrades to select CANDU plant simulators. In the third quarter of 2010, L-3 MAPPS was awarded the contract for a full scope simulator for the Embalse nuclear power station in Córdoba Province, Argentina. Through the development of this project, L-3 MAPPS has devised a full scope operator training simulator base on state-of-the-art technologies (both hardware and software) and simulation techniques.

Article Details

Section
Articles