Pickering NGS Emergency Water Supply System Emergency Start Flow Simulation and Experiment
Main Article Content
Abstract
A proposed modification to the OPG Pickering Nuclear Generation Station Emergency Water Supply (EWS) system was analyzed using the Industry Standard Toolset code GOTHIC [1] to determine the acceptability of the proposed system configuration during pump start-up. The new configuration of the system included a vertical dead-ended pipe, initially filled with air. The simulation demonstrated that no significant water hammer effects were predicted and tests performed with the new configuration confirmed the analysis results.
Article Details
Section
Articles