Reduction of Radioactive Waste Production at Gentilly-2 NPP
Main Article Content
Abstract
This paper describes the strategy used at Gentilly-2 NPP to reduce the radioactive waste
generation. The objective of this project is to ensure that the in-operation radioactive waste storage area availability would be enough until the new radioactive waste facility is built and commissioned.
generation. The objective of this project is to ensure that the in-operation radioactive waste storage area availability would be enough until the new radioactive waste facility is built and commissioned.
Article Details
Section
Articles