Valve Packing Manual: A Maintenance Application Guide
Main Article Content
Abstract
Since 1970, AECL Chalk River Mechanical Equipment Development (MED) branch has invested over 175 person years in testing related to improving valve packing performance. Successful developments, including, "liveloading", reduced packing heights, and performance-based packing qualification testing have been implemented. Since 1986, MED and the Integrated Valve Actuator Program Task Force - Valve Packing Steering Committee (IV AP-VPSC) have been involved in the development of combination die-formed graphite packing for use in CANDU plants. Many reports, articles, and specifications have been issued. Due to the large amount of test data and reports, a more user-friendly document has been prepared for everyday use. The Valve Packing Manual is based on many years of MED research and testing, as well as operating experience from CANDU nuclear generating stations (NOS). Since 1986, packing research and testing has been funded by the CANDU Owners Group (COG), the Electric Power Research Institute (EPRI), and participating valve packing manufacturers. The Valve Packing Manual (VPM) provides topical summaries of all work related to valve packing done since 1985. It includes advances in configuration design, stem packing friction, materials specifications, and installation procedures. This paper provides an overview on the application of the VPM with a focus on qualification testing, packing configuration, and stem packing friction.
Article Details
Section
Articles